UTILITY INFRASTRUCTURE

  • Water: 2 water plants with daily upply capacity of 300,000m3 and 180,000m3 respectively.  Rates at RMB2.05/ton for manufacturing industry.
  • Power: The voltage level is 100/10/0.4kv.  The rate is RMB0.473/kwh for heavy manufacturing users, and RMB0.649/kwh for others.
  • Gas: The Yancheng natural gas field spreads 200km2.  Methane concentration is 96.7% and is sulphur free.
  • Heat: The capacity is 100tons/hour, with pressure of 1.0Mbar – 1.2Mbar and temperature at 300°C.  The rate is RMB105/ton.

For currency conversion, please feel free to use XE.com’s Universal Currency Converter

Economic and Social Advantages | Geography and Humanities | Popular Sites | Produces | Urban Infrastructure | Utility Infrastructure | Transportation Infrastructure | Industry Profile | Policy Advantages of Investing in Yandu | Why Invest in Yandu? | Picture Gallery